Policy Index
Need Official PDF Gazette?

Download the full executive policy document signed by the State SDGs Steering Committee.

REF: PLS/SDG-PSU/POL/2026/V1 Effective: October 2026

1. Executive Summary & Policy Mandate

This Policy Framework establishes a standardized, institutionalized governance structure for the planning, execution, localized tracking, and public evaluation of Sustainable Development Goals (SDGs) initiatives across all 17 Local Government Areas (LGAs) in Plateau State.

Executive Directive 01/2026

All capital projects executed by State MDAs or Local Government Area Councils must explicitly map to at least one primary SDG target and be indexed within the State SDGs Central Database prior to budgetary disbursement.

The Four Pillars of SDG Governance
Pillar 1: Grassroots Localization Tailoring interventions to specific LGA priorities (e.g., agriculture in Shendam vs. peacebuilding in Barkin Ladi).
Pillar 2: Digital Open Governance Mandating real-time project visibility, milestone metrics, and public reporting on digital channels.
Pillar 3: Inter-MDA Alignment Pillar 3: Inter-MDA Harmonization Eliminating operational silos between State Ministries and LGA Steering Committees.
Pillar 4: Public Verification Equipping citizens with feedback portals to flag delays, upload photos, and verify completed projects.
OPERATIONAL SOPs

2. Standard Operating Procedures (SOPs)

SOP-01: Project Initiation & SDG Tagging

Before any procurement or contract award, MDAs must submit a Project Charter designating the primary SDG Target, target ward, exact coordinates, and quantifiable beneficiary targets.


SOP-02: Digital Indexing & Tracker Entry

Upon approval, the SDGs-PSU Data Unit issues a unique Project PIN Number and publishes contractor details, baseline progress ($0\%$), approved budget, and target delivery dates to the public website.


SOP-03: Milestone Tranche Disbursement

Project funds are strictly linked to verified physical milestones:

  • Tranche 1 (Mobilization): Released upon site handover and public tracker registration.
  • Tranche 2 (50% Completion): Contingent on physical field inspection by M&E officers verifying $\ge 50\%$ structural completion with geo-tagged photo proof.
  • Tranche 3 (Final Release): Released only after LGA Steering Committee sign-off and status update to Completed.
DATA GOVERNANCE

3. Digital Transparency & Data Integrity

To protect the credibility of state data and ensure public trust, all digital reporting through the Web Tracker and Mobile Application operates under strict protocol standards:

⏱️ 72-Hour Sync Mandate

Field audit reports and physical progress updates must be uploaded to the central database within 72 hours of site inspection.

🔒 Open Data Public Access

All non-classified capital project records, budget allocations, and contractor metrics remain open access for public audit.

✍️ Two-Tier Editorial Review

All press releases published through the Staff Portal require drafting by a Desk Officer and final authorization by the Unit Head.

RISK CONTROL

4. Risk Management & Governance Matrix

Risk Category Identified Threat Mitigation Standard
Operational Delayed reporting from distant rural LGAs Offline-capable mobile field audit app with auto-sync upon connection.
Fiduciary Fund misallocation or inflated progress claims Milestone-linked tranches verified by independent CSO auditors & geo-tagged photo proof.
Technical Server downtime or unauthorized database edits Role-Based Access Control (RBAC), SSL encryption, and daily automated cloud backups.